Alberta Utilities Commission

    Decision Information

  • Case name
    ATCO Gas and Pipelines Ltd. (South) (Re)
  • Regulator
    Alberta Utilities Commission
  • Date
    2015-01-16
  • File numbers
    3421-D01-2015
  • Decision-makers
    Anne Michaud
  • Document type
    Decision
  • Summary:

    In this decision, the Alberta Utilities Commission (AUC or the Commission) must decide whether it is in the public interest to approve a new high-pressure pipeline. ATCO Gas and Pipelines Ltd. (South) (ATCO) applied on September 19, 2014, under the Pipeline Act to construct and operate a new high-pressure natural gas transmission pipeline. The proposed pipeline, a component of the Urban Pipeline Replacement (UPR) project referred to as the Northeast Calgary Connector (the project), would be approximately 16.7 kilometres in length and located in northeast Calgary within or near the transportation utility corridor (TUC) along Stoney Trail, as shown on the following map.

Decision Content